33 towers, and only rent to keep them up.

Pruitt-Igoe, St. Louis, 1954 to 1976. Its fall was called the death of modern architecture. Historians since have looked hard at the budget.

Pruitt-Igoe · St. Louis, Missouri, United States
The cards

Pruitt-Igoe in ten cards.

Read the bold lines alone for the short version.

The four acts

Read, design, price, build and tend.

The four phases from our approach, applied to Pruitt-Igoe: what happened in each, what worked and what did not.

Act 1: Read

A 57-acre tract in the DeSoto-Carr neighborhood on St. Louis's north side, cleared under the city's postwar redevelopment plan. In 1950 the city received a federal commitment for 5,800 public housing units under the Housing Act of 1949, and about half went to Pruitt-Igoe. Public housing was meant to rehouse people displaced by slum clearance and redevelopment, so density was set higher than the neighborhood it replaced. St. Louis had 856,796 residents in 1950 (census).

WorkedThe need was real: the city's 1947 plan called DeSoto-Carr 'extremely obsolete' (von Hoffman), and the new apartments were a large step up from the homes tenants left (Bristol).
Did notThe plan read demand at its peak. By the time the project opened, demand for inner-city low-income housing had tapered off as suburban building opened the private rental market (Bristol, citing Montgomery). St. Louis fell to 622,236 residents by 1970, a loss of about 234,000 (census). The 1947 plan for the site had proposed two- and three-story row apartments and a park (von Hoffman).

Act 2: Design

Buildings: 33 identical eleven-story slabs, about 2,700 to 2,870 apartments depending on the source, by Leinweber, Yamasaki & Hellmuth (commissioned 1950). Skip-stop elevators served glazed galleries every third floor, with laundry and storage off them. Green Infrastructure: a planned landscape (a 'river of trees') was cut to sparse trees, a ballfield and scattered play equipment. Regenerative Placemaking: children's play areas, ground-floor bathrooms and, by one account, ground-floor businesses were cut. Innovative Finance: none for operations (see Act 3). The move that matters most: a single building type at high density, sized for a city that was expected to need it.

WorkedThe architects' first scheme mixed high-rise, mid-rise and walk-up buildings, and the local authority accepted it (Bristol). The galleries were an attempt to give each tower smaller 'neighborhoods' inside it. Yamasaki wrote in 1952 that low buildings at low density were 'unquestionably more satisfactory.'
Did notWho imposed the towers is contested. Bristol (from Meehan) says a federal Public Housing Administration field officer insisted on 33 identical towers to meet cost limits. Von Hoffman says local leaders wanted high-rise, contractors' bids ran St. Louis costs 60 percent above the national average, and the city raised density, shrank rooms and removed amenities when federal cost ceilings held. Both accounts agree cost pressure stripped amenities and cheapened hardware. The skip-stop elevators and unwatched galleries became a known design fault (Bristol; Newman).

Act 3: Price

Construction was federally funded; by one count it cost about $36 million (Ramroth, via Wikipedia; secondary). Under the 1937 and 1949 Housing Acts, the federal government financed capital through annual contributions contracts, while operations were to be sustained mainly by tenant rents (CRS). HUD's own account: 'the project's maintenance and operations were unsubsidized' and upkeep 'depended entirely on rent from the project's low-income tenants.' Federal operating assistance was first authorized in 1969, with the Brooke Amendment's 25 percent rent cap (CRS). Rent was the only source for upkeep for about the first decade: federal repair grants began in 1965 (Bristol), operating aid was authorized in 1969 (CRS), and federal renovation grants of more than $1 million followed in the 1970s (Meehan via Wikipedia; secondary).

WorkedFederal capital built about 2,800 homes on cleared land in a few years. In 1967 the subsidy per household was about $545 a year, one-fifth of tenants' mean family income (Rainwater).
Did notThe capital structure had no line for stewardship. A project for very poor tenants had to pay its own upkeep from their rents, so every vacancy cut the maintenance budget. After 1960 rents no longer covered operating costs and the authority drew down reserves and cut other projects; minimum rent rose from $20 a month in 1952 to $58 in 1968 (Meehan, via Wikipedia; secondary).

Act 4: Build and tend

Pruitt took its first tenants in 1954; the complex was complete by 1956. Occupancy figures disagree: Bristol says it peaked at 91 percent in 1957 and then fell; TCLF says it dropped to nearly fifty percent after desegregation in 1955; Newman says it never passed 60 percent. All agree it fell, and by 1967 vacancy had run over 20 percent for years (Rainwater). Federal repair and social-program grants began in 1965; the authority spent more than $5 million trying to fix the project before 1972 (von Hoffman). A nine-month rent strike in 1969 drained reserves further (Bristol). The first building was demolished on March 16, 1972, as a test; HUD decided in 1973 to demolish the rest, and the site was cleared by 1976.

WorkedTenants organized: the 1969 rent strike ended with the housing authority's board resigning and tenant organizations gaining influence (Meehan, via Wikipedia; secondary). A local redevelopment group that included former residents proposed buying and renovating four buildings (Bristol, citing Comerio). Where two families shared a landing, the space stayed clean (Newman).
Did notA feedback loop ran the wrong way: lower occupancy cut rent income, the authority cut maintenance, elevators and repairs failed, and more people left (Bristol; HUD). HUD turned down the residents' group's renovation proposal. After 1976 the site stayed vacant until it became a demolition landfill in the 1990s (EPA); by 2014 half held two city schools and half had grown into urban forest (HUD).
Scorecard

The six outcomes, with sources.

Mobility, carbon, health, economy, resilience and property value. Where the sources do not support a number, the scorecard says so.

OutcomeResultScope and yearSource
MobilityNo reliable data found. Qualitative only: by the film director's account reported by HUD (2014), the area became 'something of an amenity desert' short of transportation, jobs and food
CarbonNo reliable data found
HealthNo reliable data found. Qualitative only: in a 1967 survey over half of tenants called broken glass and trash, dangerous elevators, and mice and cockroaches 'a very big problem'
Economy545 dollars per household per year, federal housing subsidy, equal to one-fifth of tenants' mean family incomePruitt-Igoe tenant households. 1967Lee Rainwater, 'The lessons of Pruitt-Igoe,' The Public Interest no. 8 (Summer 1967), p. 124
ResilienceNo reliable data found. Qualitative only: elevator and heating failures are reported (Bristol 1991; Miller and Rainwater 1967 via Wikipedia), but no outage measure was found
Property valueover 20 percent of apartments vacant at all times (20 to 25 percent overall; 35 to 40 percent in two-bedroom units)Whole project; other counts: occupancy peaked at 91 percent in 1957 (Bristol); Pruitt 57.1 and Igoe 48.9 percent occupied in 1969 (Meehan via Wikipedia, secondary); 10 of 33 buildings occupied in 1970 (same). No sale or market value data found; construction cost about $36 million (secondary). several years before 1967Lee Rainwater, 'The lessons of Pruitt-Igoe,' The Public Interest no. 8 (Summer 1967), pp. 116 to 117
The story

33 towers, and only rent to keep them up.

Pruitt-Igoe was 33 identical eleven-story towers on 57 acres of St. Louis's north side. The critic Charles Jencks wrote that modern architecture died there "on July 15, 1972 at 3.32pm (or thereabouts)," as Dezeen recounts. Demolition actually began on March 16, 1972, with a test of whether explosives were cheaper than a wrecking ball, by Katharine Bristol's 1991 history. Jencks also called the blocks fourteen stories and award-winning. They were eleven stories, and they never won a prize. The record points less at the architecture than at the money.

The place before. In 1950 St. Louis had 856,796 residents, by the census, and a federal commitment for 5,800 public housing units. About half went to Pruitt-Igoe, on land cleared under the city's redevelopment plan, at a density meant to rehouse people displaced by other clearance. Demand for low-income housing had never been higher. By the time the project opened in 1954, Bristol writes, it had tapered off, as new suburbs opened up the private rental market. (Other sources give 1954 to 1956.) By 1970 the city had 622,236 residents, about 234,000 fewer.

What they built. The architects, Leinweber, Yamasaki & Hellmuth, first proposed a mix of high-rise, mid-rise and walk-up buildings. What was built was 33 slabs with about 2,800 apartments, skip-stop elevators and glazed galleries every third floor. Why is contested. Bristol says a federal field officer imposed the towers to meet cost limits. The historian Alexander von Hoffman says local leaders wanted high-rise, contractors' bids ran 60 percent above the national average, and the city cut amenities to fit. Both agree amenities were cut. The planned landscape became sparse trees and a ballfield.

What it cost. Federal money paid to build it, about $36 million by one count. Running it was another matter. Under the public housing law of the time, a local authority paid for operations and maintenance mainly from its tenants' rents, as a Congressional Research Service report explains. A 2014 HUD article summarizing the film director's talk puts it plainly: the project's "maintenance and operations were unsubsidized." That held for about a decade. Federal repair grants began in 1965, Bristol writes; federal operating aid was authorized in 1969; and more federal renovation grants followed in the 1970s.

How it ran. Occupancy figures disagree. Bristol found it peaked at 91 percent in 1957 and then fell; the Cultural Landscape Foundation says it dropped to "nearly fifty percent" after desegregation in 1955; Newman wrote that it never passed 60 percent. All agree it fell. Fewer tenants meant less rent; less rent meant fewer repairs; and, in Bristol's account, broken elevators and deferred repairs sent more people away. By 1967, the sociologist Lee Rainwater reported, vacancy had run above 20 percent for years, and no other public housing project in the country came close. The authority spent more than $5 million before 1972. HUD decided in 1973 to clear the site, and it was empty by 1976.

What did work. The apartments. Bristol notes the first tenants appeared pleased. In Rainwater's 1967 study, the great majority said their apartments were better than their previous homes. One tenant summed up the program: "Inside the apartment they did, but not outside." Oscar Newman, the critic most associated with blaming the design, found that landings shared by two families were clean and well kept. He also noted that middle-income towers pay for doormen and porters, and public housing could barely pay for daytime maintenance.

What is contested. The design had real faults: elevators that skipped floors and galleries no one could watch. Newman and the postmodern critics put the design first. Bristol and HUD's 2014 account put money, a shrinking city and segregation first. This teardown follows the weight of those sources.

The pattern. Innovative Finance: capital structured for long-term stewardship. Pruitt-Igoe had capital to build and none structured to tend. When the upkeep of homes for people with very little money depends on those people's rent, each empty apartment cuts the repair budget, and each cut repair empties more apartments.

Would you live here?

Would you live here?

Pruitt-Igoe: yes or no.

Sources and credits

Every fact, with its source.

Corrections are dated and added here. Write to [email protected].

Sources for every claim

Short names used below:

  • BRISTOL: Katharine G. Bristol, "The Pruitt-Igoe Myth," Journal of Architectural Education 44, no. 3 (May 1991), pp. 163 to 171, doi:10.1080/10464883.1991.11102687, JSTOR 1425266. Read in full from a JSTOR copy hosted at https://urbanpolicy.net/wp-content/uploads/2015/06/Bristol1991_Pruitt-Igoe_Myth.pdf . Peer-reviewed. Bristol relies heavily on Meehan (1979) and Montgomery (1985) for the money and vacancy history; locators give the printed page.
  • HUD-EDGE: U.S. Department of Housing and Urban Development, Office of Policy Development and Research, "Why Did Pruitt-Igoe Fail?", PD&R Edge featured article (reporting a HUD event of September 9, 2014 with Chad Freidrichs, director of the 2011 film The Pruitt-Igoe Myth). https://www.huduser.gov/portal/pdredge/pdr_edge_featd_article_110314.html . The live page refused automated reads; read in full from the Wayback Machine copy (https://web.archive.org/web/2023/https://www.huduser.gov/portal/pdredge/pdr_edge_featd_article_110314.html). Much of it reports the film director's remarks; the article carries a disclaimer that it does not necessarily reflect HUD policy.
  • RAIN-1967: Lee Rainwater, "The lessons of Pruitt-Igoe," The Public Interest no. 8 (Summer 1967), pp. 116 to 126. https://www.nationalaffairs.com/public_interest/detail/the-lessons-of-pruitt-igoe ; PDF https://www.nationalaffairs.com/storage/app/uploads/public/58e/1a4/a4b/58e1a4a4b8a8e192916506.pdf . Read in full. Contemporary account by the lead of a three-year field study of the project; it includes a survey of a representative tenant sample. Its language about residents is of its time; no wording from it about residents' behavior is used in the cards.
  • VONH: Alexander von Hoffman (Joint Center for Housing Studies, Harvard University), "Why They Built the Pruitt-Igoe Project," excerpt of his working paper "Why They Built Pruitt-Igoe," formerly at http://www.soc.iastate.edu/sapp/PruittIgoe.html . Read in full from the Wayback copy: https://web.archive.org/web/20020830164545/http://www.soc.iastate.edu/sapp/PruittIgoe.html . The full working paper was not read.
  • NEWMAN-1996: Oscar Newman, Creating Defensible Space (U.S. Department of Housing and Urban Development, Office of Policy Development and Research, April 1996), pp. 9 to 12. https://www.huduser.gov/publications/pdf/def.pdf ; read from the Wayback copy (https://web.archive.org/web/2020/https://www.huduser.gov/publications/pdf/def.pdf). Newman is the main advocate of the design explanation. Several of his figures conflict with other sources.
  • CRS-2014: Maggie McCarty, Introduction to Public Housing, Congressional Research Service report R41654, January 3, 2014. https://www.everycrsreport.com/files/20140103_R41654_38e4fc2f8ea8791619fc755f6b6375a35bea041e.html . History section read.
  • CENSUS: Campbell Gibson, Population of the 100 Largest Cities and Other Urban Places in the United States: 1790 to 1990, U.S. Census Bureau Population Division Working Paper 27 (June 1998), Tables 17 to 22. https://www2.census.gov/library/working-papers/1998/demo/pop-twps0027/ (files tab17.txt to tab22.txt). Read the St. Louis rows.
  • TCLF: The Cultural Landscape Foundation, "Wendell O. Pruitt Homes and William Igoe Apartments (Pruitt-Igoe), St. Louis, MO." https://www.tclf.org/landscapes/wendell-o-pruitt-homes-and-william-igoe-apartments-pruitt-igoe . Read in full.
  • DEZEEN-2022: Catherine Slessor, opinion, Dezeen, July 15, 2022. https://www.dezeen.com/2022/07/15/modernisms-death-greatly-exaggerated-opinion/ . Read in full. Used only for the Jencks quotation and as a second voice on dates.
  • EPA: U.S. Environmental Protection Agency, "From Triage to Recovery: Pruitt Igoe Becomes New Medical Campus in St. Louis" (last updated April 27, 2026). https://www.epa.gov/mo/triage-recovery-pruitt-igoe-becomes-new-medical-campus-st-louis . Read in full.
  • MHS: Missouri Historical Society catalog descriptions of the building dedication plaques (identifiers 2023-061-0001 and 2023-061-0002), as carried on Wikimedia Commons via DPLA. https://commons.wikimedia.org/wiki/File:Building_Dedication_Plaque_from_the_Pruitt_Public_Housing_Project_-_DPLA_-_82b7b7c4f5b8ce65b5d77bba8ae1041d.jpg
  • WP: Wikipedia, "Pruitt-Igoe", https://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe , read from the page source on 2026-10-26. Used to point to the books it cites: It cites by page Eugene Meehan, The Quality of Federal Policymaking: Programmed Failure in Public Housing (University of Missouri Press, 1979); Lee Rainwater, Behind Ghetto Walls (Aldine, 1970); William Ramroth, Planning for Disaster (Kaplan, 2007); Roger Montgomery (1985); and St. Louis Post-Dispatch articles. Meehan and Rainwater (1970) are on the Internet Archive as lending-only items. Figures marked "WP citing ..." below come from Wikipedia's citations of those books, not from the books themselves.

Claims

ClaimSourceURLSupporting line or locator
---|---|---|---
Pruitt-Igoe was built under the Housing Act of 1949BRISTOLsee abovep. 163: "Pruitt-Igoe was created under the United States Housing Act of 1949, which made funds directly available to cities for slum clearance, urban redevelopment, and public housing."
In 1950 St. Louis got a federal commitment for 5,800 public housing units; about half went to Pruitt-IgoeBRISTOLsamep. 164: "In 1950 St. Louis received a federal commitment for 5800 public housing units, about half of which were allocated by the St. Louis Housing Authority to Pruitt-Igoe."
Site: 57 acres on the north side, in the DeSoto-Carr neighborhood, cleared under the postwar redevelopment planBRISTOL; TCLF; RAIN-1967see aboveBRISTOL p. 164: "Located on a 57-acre site on the north side black ghetto, it was one of several tracts that had been targeted for slum clearance"; TCLF: "The 57-acre Pruitt-Igoe complex, located in the DeSoto-Carr neighborhood"; RAIN-1967 p. 116: "one 57-acre tract"
Before Pruitt-Igoe, the 1947 city plan proposed two- or three-story row apartments and a park for DeSoto-Carr; Mayor Joseph Darst, elected 1949, favored high-rise projectsVONHsee above"The commission proposed clearing the area and constructing 'two- or three-story row type apartment buildings' and a large public park. The election of Joseph Darst as mayor transformed these plans." Darst "greatly admired the new high-rise public housing projects" in New York
The plan was 33 identical eleven-story buildingsBRISTOL; RAIN-1967; VONH; HUD-EDGEsee aboveBRISTOL p. 164: "a scheme using 33 identical eleven-story elevator buildings"; RAIN-1967 p. 116: "33 eleven-story slab-shaped buildings"; HUD-EDGE: "3 of the project's 33 towers"
Unit count: from about 2,700 to 2,870, by sourceBRISTOL; RAIN-1967; NEWMAN-1996; VONH; TCLFsee aboveBRISTOL p. 164: "The 2700-unit project would house 15,000 tenants"; RAIN-1967 p. 116: "designed to provide housing for about 2800 families"; NEWMAN-1996 p. 9: "2,740-unit public housing highrise development"; VONH: "contained 2,870 dwelling units in 33 eleven-story buildings"; TCLF: "nearly 3,000 residential units". WP gives 2,870 (1,736 Pruitt, 1,132 Igoe) citing St. Louis Post-Dispatch, September 9, 1956
Planned population: 15,000 tenants (Bristol); about 10,000 people in 2,000 households in 1967BRISTOL; RAIN-1967see aboveBRISTOL p. 164 as above; RAIN-1967 p. 116: "At present, it houses about 10,000 Negroes in 2,000 households" (1967 wording)
Density was set higher than the slum it replaced, to house people displaced by other clearanceBRISTOLsee abovep. 164: "at densities higher than the original slum dwellings. The high density resulted from housing and redevelopment officials' expectations that these projects would eventually come to house not only those displaced by slum clearance for Pruitt-Igoe, but also by demolition for redevelopment projects"
Architects: Leinweber, Yamasaki & Hellmuth, commissioned in 1950; Minoru Yamasaki led the designBRISTOL; TCLFsee aboveBRISTOL p. 164: "In 1950 the St. Louis Housing Authority commissioned the firm of Leinweber, Yamasaki & Hellmuth to design Pruitt-Igoe"; TCLF: "designed by Minoru Yamasaki of the St. Louis-based firm Leinweber, Yamasaki, & Hellmuth"
The architects' first proposal mixed high-rise, mid-rise and walk-up buildings; it exceeded the federal cost limit per unit, and a Public Housing Administration field officer insisted on the uniform schemeBRISTOLsee abovep. 164: "Their first design proposals called for a mixture of high-rise, mid-rise, and walk-up structures. Though this arrangement was acceptable to the local authority, it exceeded the federal goverment's maximum allowable cost per unit. At this point a field officer of the federal Public Housing Administration (P.H.A.) intervened and insisted on a scheme using 33 identical eleven-story elevator buildings" (citing Meehan 1979 p. 71)
Counterview: PHA cost limits did not force the scale; contractor bids ran St. Louis costs 60 percent above the national average, and the city responded by raising density, shrinking rooms and removing amenitiesVONHsee above"Nor is there any truth in claims that PHA cost limits forced the authority to increase the project's scale. On the contrary, building contractors inflated their bids to the point that public-housing construction costs in St. Louis were 60 percent above the national average. When the PHA would not raise its unit cost ceilings to accommodate the contractor bids, the city responded by raising densities, reducing room sizes, and removing amenities."
Site and size, number of units and density were set by the housing authority before the architects beganBRISTOLsee abovep. 164: "The architects' task was constrained by the size and location of the site, the number of units, and the project density, all of which had been predetermined by the St. Louis Housing Authority."
Cost cutting removed children's play areas, landscaping and ground-floor bathrooms, and cheapened hardwareBRISTOL (citing Meehan)see abovep. 165: "In addition to the elimination of amenities, such as children's play areas, landscaping, and ground-floor bathrooms, the cost cutting targeted points of contact between the tenants and the living units."
The planned landscape was cut to sparse trees, a baseball field and scattered play equipmentTCLFsee above"The rich formal landscaping planned for the campus ... was omitted through budget cuts in favor of sparse deciduous tree plantings, a baseball field, and scattered playground elements."
A "river of trees" was meant to flow under the buildingsNEWMAN-1996see abovep. 10: "'A river of trees' was to flow under the buildings."
Design features: skip-stop elevators and glazed galleries on every third floor, meant as "vertical neighborhoods," with laundry and storage off the galleriesBRISTOLsee abovep. 165: "skip-stop elevators and glazed internal galleries ... intended to create 'individual neighborhoods' within each building. The galleries, located on every third floor ... Laundry and storage rooms also opened off the galleries."
Construction cost about $36 millionWP citing Ramroth (2007) p. 165; St. Louis Post-Dispatch retrospective via search excerpthttps://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe ; https://www.stltoday.com/news/local/metro/years-ago-a-final-blow-is-dealt-to-pruitt-igoe/article_e2a30e7c-f180-5770-8962-bf6e8902efc1.htmlWP: "Pruitt-Igoe initially cost $36 million"; Post-Dispatch excerpt (abstract used; full text not available): "federal housing appropriations paid most of the $36 million to build them". Secondary; used on a card only as "about $36 million, by one count."
Federal funding paid for construction; operations and maintenance were not subsidized and depended on tenants' rentHUD-EDGEsee above"Although federal funding supported Pruitt-Igoe's construction, the project's maintenance and operations were unsubsidized. Because Pruitt-Igoe's upkeep depended entirely on rent from the project's low-income tenants, excessive vacancies would imperil its financial and physical condition."
Under the 1949 Act, local authorities were expected to fund operations and maintenance from rentsBRISTOLsee abovep. 166: "Under the 1949 Housing Act, local housing authorities were expected to fund their operations and maintenance out of rents collected from tenants."
National program design: federal capital financing under annual contributions contracts; operations sustained mainly on rents; operating assistance first authorized in 1969, when the Brooke Amendment capped rent at 25 percent of incomeCRS-2014see above"The federal government would provide capital financing under long-term Annual Contributions Contracts (ACCs)." "Public housing's operations would be sustained primarily on tenant rents"; the Housing and Urban Development Act of 1969 "authorized HUD to begin providing operating assistance to PHAs"; "the Brooke Amendment capped tenant contributions toward rent at 25% of family income."
Pruitt opened to tenants in 1954; the complex was completed by 1956HUD-EDGE; BRISTOL; VONH; MHSsee aboveHUD-EDGE: "In 1954, the first tenant moved into"; BRISTOL p. 165: "Pruitt-Igoe was completed in 1954"; VONH: "completed in 1956". WP (citing Post-Dispatch, July 23, 1955): Pruitt first tenants November 1954, Igoe July 1955. Shown as "opened 1954 to 1956"
Planned as two segregated parts: Pruitt for Black tenants, Igoe for white tenantsRAIN-1967; BRISTOL; TCLF; VONHsee aboveRAIN-1967 p. 117: "Igoe was built for whites, Pruitt for Negroes" (1967 wording); BRISTOL p. 165: "originally conceived as two segregated sections (Pruitt for blacks and Igoe for whites)"; TCLF: "the Igoe Apartments were originally designated for European-American residents and the Pruitt Homes for African-American residents"
HUD's account: originally two separately located projects; when the white site fell through, segregated complexes on one plotHUD-EDGEsee above"Pruitt-Igoe was originally intended to be two separately located public housing projects: one for white residents and one for black residents. When the location for the white development fell through, the city planned to build segregated complexes on the same plot."
Desegregated in the mid-1950s; white tenants left and by the mid-1960s tenants were almost all BlackHUD-EDGE; TCLF; RAIN-1967see aboveTCLF: "When the complex was desegregated in 1955, many European-American residents left"; HUD-EDGE: "the tenant population of Pruitt-Igoe was almost entirely black by the mid-1960s"; RAIN-1967 p. 117: "all of the whites have moved out". Which court ordered it is disputed
Bristol: the first tenants appeared pleased; the units were a much higher level of amenity than the homes they had leftBRISTOLsee abovep. 165: "Overall Pruitt-Igoe's first tenants appeared pleased with their new housing. Despite the relatively cheap construction quality, the units still represented a much higher level of amenity than the dilapidated units they had vacated or been forced to leave."
1967 survey: the great majority of tenants felt their apartments were better than their previous homesRAIN-1967see abovep. 118: "although the great majority of the tenants feel that their apartments are better than their previous dwelling units, only a minority demonstrate any real attachment to the project community"
A tenant, 1967: the program succeeded inside the apartment, not outsideRAIN-1967samep. 118: "Inside the apartment they did, bnt [but] not outside."
A later survey figure: 78 percent satisfied with their apartmentWP citing Rainwater (1970) p. 11https://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe"78% of residents reported that they were satisfied with their apartment". Secondary; not used on cards
Landings shared by two families were clean and well kept; apartments were neat and kept "with great pride"NEWMAN-1996see abovep. 11: "Where only two families shared a landing, it was clean and well-maintained. If one could get oneself invited into an apartment, one found it neat and well maintained, modestly furnished perhaps, but with great pride." (Newman's dash replaced with a comma)
Newman's design argument: corridors shared by 20 families and lobbies shared by 150 gave no sense of controlNEWMAN-1996samep. 11: "corridors shared by 20 families, and lobbies, elevators, and stairs shared by 150 families were a disaster"
Newman also points to money for upkeep: middle-income high-rises fund doormen and porters; high-rise public housing barely funds daytime maintenanceNEWMAN-1996samepp. 12 to 13: "Middle-income apartment buildings have funds available for doormen, porters, elevator operators, and resident superintendents ... but in highrise public housing, there are barely enough funds for 9-to-5 nonresident maintenance men"
Carr Square Village, older row houses across the street, stayed fully occupiedNEWMAN-1996samep. 11: "Across the street from Pruitt-Igoe was an older, smaller, row-house complex, Carr Square Village ... It had remained fully occupied and trouble-free"
Demand for inner-city low-income housing had tapered off by 1954; suburban building opened the rental market and many chose private housingBRISTOL (citing Montgomery 1985)see abovepp. 165 to 166: "by the time the project opened in 1954, this demand had tapered off. Slow overall metropolitan population growth and the overproduction of inexpensive suburban dwellings helped open up the previously tight inner-city rental market to blacks. Many chose to live in inexpensive private dwellings rather than in public housing."
Planners assumed the project would stay full of working-class tenantsHUD-EDGEsee above"Pruitt-Igoe's planners, Freidrichs noted, had assumed that the project would be consistently filled with working-class people seeking housing in the city." (the film director's remark, reported by HUD)
Occupancy peaked at 91 percent in 1957 and then declinedBRISTOLsee abovep. 166: "Pruitt-Igoe's occupancy rate peaked in 1957 at 91% and immediately began to decline."
Vacancy was higher than comparable St. Louis projects from the time it openedHUD-EDGEsee above"research demonstrated that, from the time it opened its doors, Pruitt-Igoe had a higher vacancy rate than did more successful, contemporaneous housing projects in St. Louis."
1967: vacancy over 20 percent at all times for several years; 20 to 25 percent overall; 35 to 40 percent in two-bedroom apartmentsRAIN-1967see abovep. 116: "In the last few years the project has at all times had a vacancy rate of over 20 percent." p. 117: "while the overall vacancy rate has run between 20 and 25 percent for several years, the vacancy rate in two-bedroom apartments has been in the 35-40 percent range."
1967: no other public housing project in the country approached its vacanciesRAIN-1967samep. 116: "no other public housing project in the country approaches it in terms of vacancies"
Occupancy by section: Pruitt 95 and Igoe 86 percent at peak; about 75 and 65 percent in the 1960s; 57.1 and 48.9 percent in 1969WP citing Meehan (1979) p. 77https://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe"Occupancy at both Pruitt and Igoe peaked in the first years, at 95% and 86% respectively. In the 1960s, Pruitt remained about 75% full and Igoe 65%. In 1969, those numbers fell to 57.1% and 48.9%." Secondary; in record notes only
By 1970 only 10 of 33 buildings were occupiedWP citing Meehan (1979) p. 96same"Only 10 of the original 33 buildings were still occupied." Secondary; not on cards
Falling occupancy and rising costs squeezed the authority; maintenance was neglectedBRISTOL (citing Meehan)see abovep. 166: "This decline in occupancy directly impacted the St. Louis Housing Authority's ability to maintain the project ... In a period of rising costs and declining occupancy, the Housing Authority was placed in a cost-income squeeze that impeded its ability to conduct basic repairs." "These demographic shifts and economic pressures resulted in chronic neglect of maintenance and mechanical breakdowns. Elevators failed to work"
After 1960, rents no longer covered operating costs; the authority drew reserves and cut other projectsWP citing Meehan (1979) p. 76same"After 1960, the rental income from Pruitt-Igoe failed to cover the cost of operation, forcing the housing authority to tap into its reserves and causing cutbacks at other developments" Secondary
Minimum rent rose from $20 a month (1952) to $58 (1968)WP citing Meehan (1979) p. 83same"raised the minimum rent from $20 a month in 1952 ... to $32 in 1958 ... $43 in 1962 ... and $58 in 1968" Secondary; in record only
1967: the subsidy per household was about $545 a year, one-fifth of tenants' mean family incomeRAIN-1967see abovep. 124: "a subsidized apartment that costs about $545 a year. This amounts to one-fifth of the mean family income of the tenants in the project."
1967: over half of households were headed by women and over half relied mainly on public assistanceRAIN-1967samep. 117: "over half of the households are headed by women and over half derive their principle income from public assistance"
State welfare rules restricted support to families without a man in the homeHUD-EDGEsee above"state welfare policies at the time restricted support to families without a man in the home, placing many residents in a difficult position."
The area became "something of an amenity desert," short of transportation, jobs and foodHUD-EDGEsameFreidrichs: the area "became something of an amenity desert," lacking sufficient access to transportation, jobs, and food
Ground-floor businesses were cut from the design; no public mailboxWP citing Ramroth (2007) p. 170 and Miller and Rainwater (1967) p. 4https://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe"ground-floor businesses had been eliminated from the design to save money, and the complex had no public mailbox" Secondary; in record only
1967 survey: over half of a representative sample called broken glass and trash, dangerous elevators, skip-stop elevators, and mice and cockroaches "a very big problem"RAIN-1967see abovepp. 117 to 118: "some of the troubles which over half of this representative sample of tenants characterized as 'a very big problem' ... A few of these problems had to do with the design and maintenance of the project: There's too much broken glass and trash around outside. The elevators are dangerous. The elevators don't stop on every floor ... There are mice and cockroaches in the buildings."
Hazards included exposed steam pipes and windows children fell fromRAIN-1967; BRISTOL (quoting Architectural Forum, 1965)see aboveRAIN-1967 p. 117: "children fall out of windows or into elevator shafts ... or burn themselves on exposed steam pipes"
Basic services such as elevators and heating often failedWP citing Miller and Rainwater, Social Work 12, no. 4 (October 1967), pp. 7 to 8https://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe"Basic services like elevators and heating often failed, and maintenance sometimes took years to respond to tenant requests." Secondary; record only
1965: first federal grants for physical repair and social programs; little effectBRISTOLsee abovep. 166: "In 1965 the first of several federal grants arrived to provide physical rejuvenation and the establishment of social programs ... The programs had little effect"
More than $1 million was spent on renovation in the 1970s, mainly federal grantsWP citing Meehan (1979) p. 112https://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe"Despite the impending demolition, more than $1 million was spent on renovation in the 1970s, mainly funded by grants from the federal government." Secondary; story says only that federal renovation grants followed in the 1970s
Before 1972 the authority spent more than $5 million trying to fix the problemsVONHsee above"In 1972, after spending more than $5 million in vain to cure the problems at Pruitt-Igoe, the St. Louis Housing Authority ... demolished three of the high-rise buildings."
1969: tenants joined residents of two other projects in a nine-month rent strikeBRISTOLsee abovep. 166: "In 1969 Pruitt-Igoe tenants joined residents of two other St. Louis public housing projects in a massive nine-month rent strike."
The strike settlement: the authority's board resigned and tenant organizations gained influenceWP citing Meehan (1979) pp. 91 to 92https://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe"It ended with a settlement under which the board of commissioners of the housing authority resigned and tenant organizations were granted more influence." Secondary; in record only
First demolition: March 16, 1972, a test of explosives against a wrecking ball, after remaining tenants were moved to 11 buildingsBRISTOL; DEZEEN-2022; Commons file description (HUD photo)see above; https://commons.wikimedia.org/wiki/File:Pruitt-igoe_collapse-series.jpgBRISTOL p. 166: "In an effort to determine whether explosion or traditional headache-ball demolition would be cheaper, all the remaining tenants were moved to 11 buildings, and on March 16, 1972 a demolition experiment levelled three buildings in the center of the project." DEZEEN-2022 (summary): the famous image shows a test demolition on 16 March 1972. Commons: "the March 16 demolition"
Further implosions in 1972: April 21, June 9 and July 15WP citing Ramroth (2007) p. 165 and Post-Dispatch, June 10, 1972https://en.wikipedia.org/wiki/Pruitt%E2%80%93Igoe"the first building was demolished with explosives on March 16, 1972. More buildings followed on April 21, June 9, and July 15." Commons dates the HUD photo series to April 1972. Secondary
HUD's own article dates the first demolition to July 15, 1972HUD-EDGEsee above"On July 15, 1972, the city of St. Louis admitted defeat and demolished 3 of the project's 33 towers." Conflicts with BRISTOL
Charles Jencks wrote that modern architecture died "on July 15, 1972 at 3.32pm (or thereabouts)"DEZEEN-2022; BRISTOLsee aboveDEZEEN-2022 quotes Jencks: "Modern architecture died in St Louis Missouri on July 15, 1972 at 3.32pm (or thereabouts)". BRISTOL p. 168: Jencks (1977) "asserted that the demolition of Pruitt-Igoe represents the death of modern architecture"
Jencks's own account called the blocks fourteen stories and award-winning; they were eleven stories and never won an awardBRISTOLsee abovep. 168 quotes Jencks: "it won an award from the American Institute of Architects when it was designed in 1951. It consisted of elegant slab blocks fourteen storeys high"; p. 168: "Pruitt-Igoe never won any kind of architectural prize. An earlier St. Louis housing project by the same team of architects, the John Cochran Garden Apartments, did win two architectural awards."
HUD decided in 1973 to demolish the rest; cleared by 1976BRISTOL; HUD-EDGE; EPAsee aboveBRISTOL p. 166: "in 1973 H.U.D. decided to demolish the rest of the project, and finally finished it off in 1976." HUD-EDGE: "By 1976, the razing of Pruitt-Igoe was complete."
A local group including former residents proposed buying and renovating four buildings; HUD said noBRISTOL (citing Comerio 1981)see abovep. 171, note 29: "a local community redevelopment group that included former Pruitt-Igoe residents made a proposal to buy and renovate four of the buildings, but were turned down by H.U.D."
Yamasaki in 1952: low buildings at low density are "unquestionably more satisfactory"BRISTOL (quoting Yamasaki, Journal of Housing 9, 1952, p. 226)see abovep. 169: "the low building with low density is unquestionably more satisfactory than multi-story living. ...If I had no economic or social limitations, I'd solve all my problems with one-story buildings."
Bristol's thesis: the design was "but one, and probably the least important" of the factorsBRISTOLsee abovep. 169: "There is clearly ample evidence that architectural design was but one, and probably the least important, of several factors in the demise of the project."
Bristol: architects had no control over location, density, the cut amenities or the high-rise typeBRISTOLsamep. 169: "The architects had no control over the project's isolated location, its excessive densities, the elimination of amenities, or the use of high-rise elevator buildings."
HUD in 2014: the film argues city decline, welfare policy, segregation and flawed planning assumptions explain the failure better than architectureHUD-EDGEsee above"The Pruitt-Igoe Myth argues that factors such as structural changes occurring in St. Louis, public welfare policies, racial segregation, and flawed assumptions made by the project's planners better explain what happened."
HUD official: many made Pruitt-Igoe "a scapegoat"HUD-EDGEsameBryan Greene: "Many made Pruitt-Igoe a scapegoat, a symbol of failure, and from Pruitt-Igoe drew conclusions about the racial and social dynamics of public housing across the country."
EPA: design flaws and lack of maintenance funding led to vacancy and crimeEPAsee above"design flaws and lack of funding for maintenance led to increased vacancy rates and crime, leaving the complex uninhabitable just 20 years later."
St. Louis city population: 816,048 (1940), 856,796 (1950), 750,026 (1960), 622,236 (1970), 453,085 (1980), 396,685 (1990)CENSUSsee aboveTables 17 to 22, row "St. Louis city, MO": 816,048; 856,796; 750,026; 622,236; 453,085; 396,685
St. Louis lost about 234,000 residents from 1950 to 1970 (27 percent); 47 percent by 1980CENSUS (computed); VONHsee above856,796 minus 622,236 = 234,560 (27.4 percent); 856,796 minus 453,085 = 403,711 (47.1 percent). VONH: "From 1950 to 1970, the city's population fell by 234,000 people, and its share of the St. Louis metropolitan area's population plummeted from 51 percent to 26 percent."
HUD's article says St. Louis lost half its population in the 1950s and 1960sHUD-EDGEsee above"St. Louis, however, experienced dramatic demographic changes during the 1950s and 1960s, losing half of its population." Conflicts with CENSUS
By 2014 half the site held two city schools and the other half had grown into urban forestHUD-EDGEsee above"Today, half of the property is occupied by two St. Louis city schools; in the other half, an overgrown urban forest has sprung up amid the rubble."
The site stayed vacant after 1976 and became a demolition landfill in the 1990s; later bought by a developer; a medical campus announcedEPAsee above"Once demolished in 1976, the site remained vacant until the 1990s when it became a demolition landfill." "purchased from the city land bank by a local developer." "Ponce Health Sciences University recently announced an $80 million investment to develop a new medical campus" (2020 projection; not confirmed built)
Today about 33 acres remain undeveloped, with prairie grasses where lawns wereTCLFsee above"an undeveloped 33-acre site bisected by remnants of concrete paths"; "Where broad lawns once spread between the towers, prairie grasses now grow."
The complexes were hailed in 1954 as an answer to blightMHSsee above"When completed in 1954 both complexes were hailed as an answer to blight and the housing problems in post-World War II St. Louis."
Image credits
  • Cover: Pruitt-Igoe, between 1963 and 1972. United States Geological Survey, via Wikimedia Commons. Public domain (US government work).
  • Act 2: Design: Aerial photo of north St. Louis, March 3, 1968 (cropped). United States Geological Survey, via Wikimedia Commons. Public domain (US government work).
  • Act 3: Price: Dedication plaque, Captain Wendell Oliver Pruitt Homes. Missouri Historical Society (2023-061-0001), via DPLA and Wikimedia Commons. Marked public domain.
  • Act 4: Build and tend: Demolition of a Pruitt-Igoe building, April 1972. U.S. Department of Housing and Urban Development, via Wikimedia Commons. Public domain (US government work).